Cat C7 Iap Valve Location

TroubleshootingSection
Note:PersonalityModuleswith a manufactureddate
Cat C7 Iap Valve Location

Cat cat ® c7 acert™ industrial diesel engine caterpillar c7 acert™. Cat c7 engine oil diagram schematic diagram data cat c7 acert wiring diagram diagram data schema cat c7 engine oil diagram. Cat C7 Iap Valve Location Patti Labelle The Winner Rar Seiler German Piano Trilian Total Bass Module Download. Hydraulic valve lash adjusters work automatically — no more time-consuming or costly manual adjustment needed. No smoke means less cleaning. The C7.1 runs on a common-rail fuel system that’s smoke-free, keeping your boat (and the air around you) clean.

beforeJUNE 99 require an electricalconnector
fortheinjectionactuationpressuresensor to be
disconnected in orderforthe'InjectionActuation
PressureControlValveDriverSpecialTest' to turn
offthedriverfortheinjectionactuationpressure
controlvalve. If theconnectorJ204/P204for
theinjectionactuationpressuresensor is not
disconnected,thevoltagetestlampwillremain on
whenthespecialtest is notactive.
Results:
Repair:Replacetheharnessfortheinjection
STOP.
Repair:Temporarilyinstall a testECM.Repeat
reinstalltheoldECM and verifythattheproblem
reoccurswiththeoldECM.
i01857920
g00725343
Sensor - Test
location of theinjectionactuationpressurecontrolvalve
SystemOperationDescription:
Usethefollowinginformation in order to troubleshoot
· 164-02InjectionActuation Pr SensorErratic(15)
theinjectionactuationpressuresensoragainst a
Thefollowingbackgroundinformation is related
Replacement Of The Injection Actuation Pressure Control Valve (IAPCV) Harness On 3100 HEUI Engines{1714}

Cat C7 Iap Valve Location Diagram

Cat C7 Iap Valve Location 3116 (8WL, ),
3126 (1WM Truck Engines)

Introduction:

This instruction is for removal and installation of the new 122-8842 Wiring Harness for the IAPCV on these engines. This harness is intended for service replacement of the section of the 122-8835 Wiring Harness that serves only the IAPCV.

Installation:

Cat C7 Iap Valve Location Code

A. Remove The Failed Harness

Iap

1. Remove the section of failed harness:

2. Locate the IAPCV at the inboard rear and top of the high pressure hydraulic pump. The pump is mounted to the back of the front cover on the upper left side of the engine, as seen from the driver's seat, (illustration 1 and 2).

3. Gently pry open the 'ears' (illustration 4), that retain the 2-pin electrical connector in place, and unplug the harness from the 122-5053 IAPCV.

4. Remove the harness tie wraps from the IAPCV back to connector P2. There is one tie a few inches below the connector (illustration 1 and 2), and two more along the engine block toward the rear.


Illustration 1. High pressure hydraulic pump (1), 2-pin Packard Electrical Connector (2), tie wraps (3), 40-pin connector P2 (4), 40-pin connector J2 (5).


Illustration 2. Hydraulic pump (6), IAPCV (7), tie wrap (8), Fuel Transfer Pump Gp (9).

5. On early production engines the 122-8835 Wiring Harness is one piece. If so, cut the IAPCV Sensor Wires where they emerge from the braid at the sensor end. On later engines, the harness has four separate sections.

Valve

6. Remove the 40-pin connector P2 from J2 on the ECM by unscrewing the M5 Allen Head Screw from the rear of J2.

7. Using the 121-9588 Deutsch Pin Removal Tool (medium blue, for #16 and #18 gauge wires), remove the two pins from P2 (illustration 3). Insert wire removal tool without twisting.

8. Remove the pink wire from P2 pin-19 and the black wire from P2 Pin-13. Cut these two wires where they emerge from the braid near P2.

B. Install New 122-8842 Wiring Harness:


Illustration 3. P2 pin-13 (1), P2 pin-19 (2), P2 harness side of 40-pin connector (3), J2 ECM side of 40-pin connector (4), M5 Allen Head Screw (5).

1. Install harness in reverse order of removal. Begin by inserting the pink wire pin into P2 pin-19 and black wire pin into P2 pin-13. After inserting, use the 45 N (10 lb) pull test, to verify that the connection is secure.

Locations

2. Blend the two wires from the replacement harness in with all the other wires coming from P2 and install a tie wrap about three inches from P2.

3. Route the replacement IAPCV Harness along with the old harness (which still contains the two twisted pairs going to the Speed Timing Sensors) until forward of the second secured tie wrap. Be sure the wires are routed next to the block, between the block and the oil feed tube to the hydraulic oil pump.

4. Use tie wraps to bind the replacement harness to the old harness. Be sure new tie wraps are installed around both harnesses in the three locations that are secured to the block. Use as many additional unsecured tie wraps as necessary to bind the two harness sections tightly together. Do not attach tie wraps to individual wires. Attach only to braided sections of harness.

NOTICE

It is especially important to replace the tie wrap nearest the sensors, to prevent sensor failure caused by vibration of loose sensor wires.

Cat C7 Ipr Valve Location


Illustration 4. Weatherpak Seal (6), 'ears' (7).

5. Be sure that the Weatherpak Seal is installed on the connector, and use care when inserting the connector into the IAPCV. Verify that the plastic 'ears' are snapped over the small projections to lock the connector in place (illustration 4).

Cat C7 Iap Valve Location Sensor

Office 2016 for mac not activating. 6. Re-install P2 onto J2 and tighten the M5 Allen Head Screw from the rear of J2 to 2.25 ± 0.25 N·m (20 ± 2 lb in), (illustration 3).